Athesi EVM10 10" Windows 10 Pro, 8Gb RAM, 128Gb Flash, WiFi, Bluetooth, 4GLTE, Ethernet, RS232, USB

https://www.fedex.eutronix.eu/web/image/product.template/32903/image_1920?unique=de37f15
Internal Reference: AT-EVM100011111

Intel Jasper Lake N5100, 8GbRAM/128Gb Flash, GPS, 10,1" display HD 800 x 1280 tactile capacitive, 700 nits ,Wifi 802.11 a/b/g/n/ac, Bluetooth Rev 5.0, USB 3.0 Type A, 4GLTE, 1000M Ethernet (12 pin connector), 1 RS232 + 1 RS232/RS485 (12 pin connector), 2 x USB 2,0 + 1 CAN/CVBS (12 pin connector), 1GPIO, input voltage 11-24V, IP65, operate temp -20°C to 60°C, 1000mA 7,4V internal battery

The Athesi EVM10 Windows 10 Pro delivers enterprise logistics coordination directly into vehicle cabins, eliminating dispatch fragmentation while maintaining compatibility with legacy ERP and fleet management software. Wide 9–36V voltage tolerance integrates seamlessly into commercial vehicles, forklifts, and agricultural equipment without power converters. IP65 protection withstands dust, vibration, and washdown exposure. Built-in GPS/GLONASS enables real-time tracking and geofencing. Dual-band WiFi and optional 4G LTE connect to backend systems over multiple routes. Flexible aviation plug expansion supports custom integrations. Familiar Windows interface reduces driver training overhead versus Linux deployments.

  • Brand: Athesi
  • Processor: Celeron
  • RAM: 8Gb
  • Hard Drive Type: Flash
  • Hard Drive Size: 128Gb
  • Screen Size: 10"
  • Connectivity / Interface: 4G, Bluetooth, Ethernet, RS232, USB, WiFi
  • 1.480,00 € 1480.0 EUR 1.480,00 € VAT Excluded

    Not Available For Sale

    • Brand
    • Processor
    • RAM
    • Hard Drive Type
    • Hard Drive Size
    • Screen Size
    • Connectivity / Interface

    This combination does not exist.

    Brand: Athesi
    Processor: Celeron
    RAM: 8Gb
    Hard Drive Type: Flash
    Screen Size: 10"